Monday, March 30, 2009
Big night?
The timing of the talk was just right. Not only is it the season for vernal pools throughout the Northeast, but we happen to be in the middle of a survey for the endangered Blue-spotted salamander near the Wapping Road Dam (see post from last week). So we are wating for that Big Night and waiting to see what we find. But the Big Night can be elusive. We had rain on the Thursday night of Jessica's talk. But it wasn't as much as predicted and no salamanders or wood frogs showed up in our survey area. So then we had our fingers crossed for the rains this weekend. Saturday night and Sunday were POURING and it was warm(ish). But still nothing. Our salmander survey expert Dan Wells tells me that it may have started raining too late on Saturday night. It usually needs to start before dusk.
So we'll keep waiting and watching.
Monday, March 23, 2009
First day of Spring!
Obviously the onset of spring is an exciting time for us at the Watershed Association. (Although, I have to admit I'm a little sad to see the slopes up north turning brown and green. Still a few more weeks left though). Although winter's grip has been slow to release this year I've still started to see the signs slowly emerging. Out in the bay I've started seeing spider crabs and horseshoe crabs moving around a lot more. I've also picked up a few flounder while working the oyster beds in the past 2 weeks. On the river, almost all of the snow is finally gone. Flows are high as the ground and surfaces releases all of the ice they've been holding. In my yard, the crocus and even a few forsythia are blooming. In the woods the vernal pools are full and ready for the 'big night'. Speaking of which, don't forget to stop by for Jess Tenzar's vernal pool talk this Thursday night at 7:00 (more info here).
Of course, this is all just the slow start of things to come. Spring has an accelerating trajectory and in no time everything will be in full swing. Of course one of the highlights for us will be the herring run. The river herring, smelt, and other fish are already on their way and will start showing up in the river in the next few weeks. We will see them congregating at the bottom of the Elm St Dam. Then, when the water temperature is just right, they will all start racing up the ladder. You can help us capture the details of this critical ecological event by getting involved in our herring count (info here). It's a great way to get personally in tune with the natural cycles of the river while generating important data on the health of this species.
Friday, March 20, 2009
Final Feasibility Study
Throughout 2008 JRWA worked closely with a team of partners to conduct a feasibility study for restoration options at the Wapping Road. The project involved a big group of private, local, state, and federal partners. This included Jones River Realty Trust (the property owner), the Town of Kingston (Cons. Comm.), Division of Marine Fisheries, the Riverways Program, and NOAA Marine Fisheries. The bulk of the technical work was conducted by Milone & MacBroom Inc, a well known river restoration firm. Our study was guided by a specific set of goals for the river:
1. Restore the river habitat back to a more natural environment.
2. Reduce operation and maintenance requirements of the Wapping Road Dam.
3. Promote long-term sustainability at the dam and of the river system.
4. Avoid or mitigate impacts to the Wapping Road Bridge relative to scour and stability.
5. Create a condition that is compatible with the adjacent mill buildings, considering
structural stability as well as ongoing and future operations.
6. Pass target fish species, including alewife, blueback herring, American eel, and sea lamprey.
7. Improve the upstream water quality in the Jones River.
8. Maintain or enhance habitat for rare species that may occur in the project area.
9. Promote recreational use of the river (i.e., canoeing and kayaking).
The study assessed the engineering, biological, ecological, economic, and logistical issues surrounding a variety of alternatives for the site. The alternatives considered included doing nothing, installing a fish ladder, installing a bypass channel, installing a roughened ramp, removing portions of the dam, and removing the entire dam. After weighing the pros and cons of each alternative, it was determined that full removal of the dam would best meet the project goals.
If you want some more detail, please take a look at the Final Feasibility Study Report.
Monday, March 16, 2009
Salamander surveys start
NHSEP has come out to see the site and they are excited about the ove
In the meantime...we'll be hosting a talk at the Landing by Jessica Tenzar. Jessica is an expert in salamanders and vernal pools. She will be discussing how to identify and certify vernal pools. She will also be presenting some of her new data that reveals the distances that salamanders travel to feed. This data suggests that existing regulations on vernal pool buffers may not be protective enough. Join us at 7:00pm on Thursday, March 26th to hear more.
Back again
Winter is holding on. But spring will break through soon and there will be a lot of activity around the river. Stay tuned as a bunch of projects get really rolling.
Wednesday, July 9, 2008
Fish lecture at the Landing
Along those lines...the Kingston Reporter was nice enough to interview me a for a piece they ran last week covering the issue of river herring declines http://www.wickedlocal.com/kingston/news/x1470896934/Where-are-they
Hope to see you all tomorrow night.
Tuesday, June 17, 2008
Love these summer days
The bay is packed with pogies (menhaden) and the stripers and other bigger fish are actively hunting them down. The last few years we’ve had big menhaden runs and I suspect that has contributed to the Sand Tiger Sharks that have turned up in the bay and the river. On the other hand, it appears that the total count for our Elm St herring count was pretty low. We haven’t quite finalized the numbers, but it doesn’t look good. There has been a lot of concern about river herring stocks in the past few years, as a result of both degraded spawning habitat and offshore takes (http://www.herringalliance.org/). Brad Chase will be doing a talk about the status of Jones River fish on July 10th. I’m sure he’ll have some valuable insights.
Like the animals, the JRWA groups have been revved up by the summer weather. We’ve kicked into gear with our water quality monitoring. In mid May Bill G. and I paddled from the Elm St dam to the Wapping Rd dam to have a look at this somewhat hidden stretch of river. With the Wapping Rd dam feasibility study getting under way this summer we wanted to look for any obstructions or other issues that might impact the flow assessments. Things seemed to be in good shape, although we probably caught the last window of opportunity before things became too overgrown to make it up the river. Later in May we initiated our nutrient sampling program for the river and Silver Lake. We’ve been able to piggyback this sampling onto to the Division of Marine Fisheries rapid assessment program for the lake. By conducting these programs in concert we gain much more information for each assessment. These sampling programs will continue through the summer and I expect that we’ll add a few more elements as we go along.